Al-Doha Power Plant
M&E:
by Al-Hani
Location:
Kuwait
Client:
Ministry of Electricity & Water
Completion Date:
1980
On this project, MORYAK successfully completed specialized air-conditioning installation geared especially to providing stable conditions of temperature and humidity within the control rooms.
The installed system included features which automatically adjusted the intake of fresh air to ensure the levied internal environmental conditions were achieved. The sanitary and drainage installations were problematic in that the discharge lines ran up to six meters below ground. Both systems were successfully installed, tested and put into operation. The cooling capacity was about 900tons.